System project scope and target confirmation
According to the overall planning requirements
of the enterprise, confirm the implementation
scope of the enterprise system and achieve the
management objectives.
-
Detailed business process planning (L3)
optimizes the process (L3),
and determines the system control mode.
-
Integration relationship with other systems
Define the data standards, interface requirements
and data interaction of each system to ensure the
interconnection of systems.
-
Hardware configuration requirements list
Based on the system business function construction
and platform requirements, output the hardware
requirements list.
-
Business function planning of digital system
Based on the overall enterprise architecture and
end-to-end scenario planning, the functional
architecture of each business system is designed.
-
Detailed technical scheme and function list
Based on the control requirements of each process,
the detailed control scheme and detailed function
list of the system are delivered.
-
URS of each system
Output the bidding documents, system
requirements, functional requirements and
acceptance criteria of each system.
-
Detailed plan for system implementation
According to the overall construction requirements,
formulate the detailed implementation plan and
resource requirements of the system.